Drimva

Firestorm Labs

Senior Quality Engineer

$170K

San Diego, United States · On-site · Senior · Full-time · Posted Oct 7, 2026

Experience
5+ years of progressive quality engineering experience; alternatively, at least 10 years of relevant experience in lieu of a relevant Engineering degree.
Education
Bachelor's degree in Engineering (Mechanical, Industrial, Aerospace, Manufacturing, or related discipline), or in lieu of a degree, minimum of 10 years’ experience of relative experience.
Visa sponsorship
Requires U.S. Person status as defined by 22 CFR § 120.62 for ITAR; the posting also states export-control eligibility may be met through specified status or otherwise obtaining required authorizations.

About the job

Build the quality foundation for Firestorm’s xCell product, covering supplier inputs, manufacturing execution, and a scalable quality management system.

What you'll do

  • Lead root-cause investigations and corrective actions for manufacturing escapes and supplier nonconformances; ensure fixes are implemented.
  • Develop inspection standards and manage supplier quality, nonconforming material, process quality, and QMS activities.
  • Analyze process and quality data, drive continuous improvement, and support audits and customer source inspections.

What they ask for

  • Bachelor’s degree in a relevant Engineering discipline, or at least 10 years of relevant experience in lieu of a degree.
  • 5+ years of progressive quality engineering experience in aerospace, defense, or precision manufacturing.
  • Experience with Continuous Improvement tools and methodologies and an AS9100 or equivalent quality management system.
  • Must meet the posting’s stated U.S. Person/export-control eligibility requirements.

Nice to have

  • AS9100 auditor training or certification, ASQ CQE/CQT, or Six Sigma Green Belt/Black Belt.
  • Experience with FMEA, control plans, PPAP/APQP, regulatory audits, or additive manufacturing inspection.

Pay

$130-$170,000 USD base salary

Tools

AS9100, CMM, GD&T, ASME Y14.5, SPC, Cpk/Ppk, MSA, 8D

Model-written summary · the original posting is authoritative

First seen Oct 30, 2026 · Last verified Nov 5, 2026 (UTC)