Drimva

IREN

Construction Commissioning Supervisor - Mechanical

Childress, Texas · On site · Full-time · Posted Oct 23, 2026

Experience
Minimum 5 years in mechanical commissioning or construction management, with at least 2 years in data center or mission-critical environments.
Education
High school diploma or equivalent required; Bachelor’s degree in mechanical engineering, construction management, or related field.
Visa sponsorship
Participates in E-Verify and provides Form I-9 information to the federal government to confirm work authorization in the United States.

About the job

Leads installation, testing, and startup of mechanical systems in data centers, ensuring safety, quality, regulatory, and performance requirements are met.

What you'll do

  • Lead commissioning of HVAC, chilled-water, and liquid-cooling systems; troubleshoot issues during startup and testing.
  • Inspect installations and materials, verify compliance, document findings, and coordinate corrective actions with subcontractors and project teams.
  • Develop and implement LOTO procedures, provide QA/QC feedback, and train subcontractor teams on company policies and procedures.

What they ask for

  • At least 5 years of mechanical commissioning or construction management experience, including at least 2 years in data center or mission-critical environments.
  • OSHA-30 certification, or obtain it within six months of hire.
  • Advanced understanding of OSHA regulations and safety protocols; in-depth knowledge of HVAC, chilled water, precision cooling, and liquid cooling technologies.
  • Proficiency interpreting P&IDs, mechanical drawings, commissioning scripts, and Change Management plans.

Nice to have

  • Bachelor’s degree in mechanical engineering, construction management, or a related field.
  • Familiarity with commissioning software, Building Management Systems (BMS), Procore, Primavera, MS Project, and Microsoft Office Suite.

Pay

$58.50 USD hourly rate; $180.00 per diem

Tools

HVAC, chilled water, precision cooling, liquid cooling, CDU, immersion cooling, direct-to-chip, Procore

Model-written summary · the original posting is authoritative

First seen Oct 28, 2026 · Last verified Nov 5, 2026 (UTC)